Redevelopment of the Viau access points – Montréal
For the Olympic Park, Charex redeveloped the Viau access points from June 2022 to September 2024. The mandate aimed to improve traffic flow, safety and accessibility in the area.
The work included rebuilding and modifying roadways, sidewalks, curbs, multi-use paths, drainage systems, signage, lighting and landscaping, along with all the roadwork and civil engineering required to optimize access and user circulation.
Scope of work
- Pavement, sidewalks and curbs
- Pistes multifonctionnelles
- Drainage
- Signage and lighting
- Landscaping
Project gallery
Click a photo to enlarge it.
The project on video
Project details
- CategoryMultidisciplinary
- ClientOlympic Park
- SectorRoadwork and road infrastructure
- LocationMontréal – Viau
- TimelineJune 2022 – September 2024
- Contract value$12,784,518 (before taxes)