Construction of the RIVMO composting complex – Salaberry-de-Valleyfield
Charex is acting as general contractor for the construction of the RIVMO organic waste composting complex in Salaberry-de-Valleyfield. Work began in August 2025 and is ongoing. The structural work is being carried out by subcontractors under Charex’s supervision.
The mandate includes site preparation, civil engineering work, construction of buildings and specialized structures, installation of composting equipment, utility networks, water and leachate management systems, and the exterior site development required for operations. The project gives RIVMO a high-performance environmental facility that reduces landfilling.
Scope of work
- Site preparation and civil engineering
- Buildings and specialized structures
- Composting equipment
- Utility networks, water and leachate management
- Exterior landscaping
Project gallery
Click a photo to enlarge it.
The project on video
Project details
- CategoryBuilding
- ClientRégie intermunicipale de valorisation des matières organiques de Beauharnois-Salaberry-de-Valleyfield (RIVMO)
- Charex's roleGeneral contractor
- SectorEnvironmental infrastructure, waste management and civil engineering
- LocationSalaberry-de-Valleyfield
- TimelineSince August 2025 (ongoing)
- Contract value$28,455,728.75 (before taxes)