Séparateur d’hydrocarbures à l’Aérocité de Mirabel – photo 1 – Charex

Oil-water separator at the Aérocité de Mirabel

For Aéroports de Montréal, Charex installed and commissioned an oil-water separator at the Aérocité de Mirabel from April to July 2020.

Located in an airport zone, the site required deep excavation and lifting the tank into place by crane, followed by connections and backfilling.

Scope of work

Project gallery

Click a photo to enlarge it.

Project details

  • CategoryCivil engineering
  • ClientAéroports de Montréal
  • LocationMirabel
  • Start of workApril 2020
  • End of workJuly 2020
  • Contract value$1,683,956 (before taxes)